Technology

Zero export is not off-grid: MEU-Z essentials

Metering, control, filing and acceptance for zero-export systems.

2026-07-26 · 5 min

How zero export works

A smart meter and CTs monitor power while the controller limits inverter output.

Why procedures still apply

The system remains grid-connected; filing, settings, review and acceptance depend on local rules.

Verify daytime demand

Use interval load data rather than monthly bills alone.